Rehabilitation Mechanical Workshop
Project of work and rehabilitation of old machining workshop to Auto Mechanic Workshop. Projects of technical facilities and management with the administration.
Alfredo Heranz Pinto
1 min read
Restaurant Gino’s Pagoda
Development of the habilitation project and technical installations of air conditioning, ventilation, electricity, gas, fire protection and acoustics for the work of a Restaurant in a protected building.
Alfredo Heranz Pinto
1 min read
LEGO license
Development of the project of habilitation and technical installations of air conditioning, ventilation, electricity, gas, fire protection and acoustics for the work of a toy library in the Arean Shopping Center. Coordination with the Arena Shopping Center for the development of the performance.
Alfredo Heranz Pinto
1 min read
Dental Clinic
Development of the project of work and habilitation of local and technical installations of air, water, electricity and sanitary systems even managements before the City council, Territorial Service of Industry (RX) and sanitary authorization of operation. Project developed in collaboration with Francesc Rifé Studio: Interior...
Alfredo Heranz Pinto
1 min read
Warehouse food products
Drafting of the project construction and facilities of a warehouse of 3000m2 and 400m2 of cold rooms. Drafting of environmental licensing project and coordination of specific projects. Development of the protection system against fire, electricity and cold storage.
Alfredo Heranz Pinto
1 min read